Which INFORMATION do you want? Search Below ↓

Nov 26, 2019

QUESTIONS BANK FOR MODEL ROOM OPERATING


  •  What are the conditions for granting Line Clear? 
  •  What are the conditions for taking off signals? 
  •  What is the VTO at this station? 
  • What action will be taken by SM when VTO is not visible? 
  •  How trains will be received when the approach signals have failed?
  •  How trains will be dispatched when departing signals are defective? 
  •  What is the station limit at this station? 
  •  What is the station section? 
  •  What is the block section on both sides? 
  •  How many signals are provided at this station? 
  •  What do you mean by slip siding why it is provided at this station? 
  •  What do you mean by MACLS? 
  • Where home signal is placed in MACLS? 
  • Where advanced starter is placed in MACLS? 
  •  What is the distance between Outer / Home? 
  •  What is the distance between Warner / Home? 
  • What is the distance between Distant / Home? 
  •  At what distance signal sighting Board is provided? 
  •   Which class of station is this ?
  •  What is standard of inter locking?
  •   How many running lines are there? 
  •  Is shunting limit board provided here? 
  •  At what distance SLB is provided? 
  •  Is BSLB provided here? 
  •  At what distance BSLB is provided? 
  •  Is A/St. provided at this Station? 
  •  At what distance A/St. is provided? 
  •  Is any shunt signal provided here? 
  •  Where a shunt signal is provided? 
  •  What type of shunt signal is this? 
  •  Is there any trap point at this station? 
  •  Why trap point is provided? 
  •  Is isolation provided at this station? 
  •  What do you mean by isolation? 
  •  Is VTO provided at this Station? 
  •  What is the peculiarity of this station? 
  •  What type of Block Inst. Are provided? 
  •  How many running lines are there? 

.


RAIL NEWS CENTER